MERX | Opportunity Abstract
Français
Sub Navigation Suppliers Sub Navigation
Sub Navigation Buyers Sub Navigation
Sub Navigation About the Service Sub Navigation
Sub Navigation About MERX Sub Navigation
Login Register

 Print-friendly Version   

 Associated Components:  Order  Document Request List:  N/A
138071 - Roof Replacement
 
Disclaimer

Header

  Reference Number PR201685
  Solicitation Number 138071
  Buying Organization SNC-Lavalin O&M Inc.
  Source ID PP.CO.ON.573009.577447.C73239
  Associated Components Yes
  Non-disclosure Agreement Not required.

Dates

  Published 2010-07-29
  Revised
  Closing 2010-08-12 02:00 PM Eastern Daylight Saving Time EDT

Details

  Opportunity Access Open
  Category Construction Services
  GSINS
  Region of Delivery Ontario
  Agreement Type
  Tender Type Invitation to Tender (ITT)
  Estimated Value
  E-bid Submission Not Available
  Site Visit / Pre-bid Meeting Mandatory
  Bid Bond Yes - 10%
  Performance Bond Yes - 50%
  Labour & Material Bond Yes - 50%

Notice Description

  138071 - Roof Replacement

SNC-LAVALIN Operations & Maintenance Inc. is inviting bids from qualified contractors for the Roof Replacement at 200 Town Centre Court, Toronto. The successful contractor must supply all labour, material and equipment necessary to • Remove and dispose the existing roofing assembly present on the main flat roof areas including, walkway, filter fabric, all insulation materials, roofing membrane, metal flashings and other existing roofing components placed on the roof deck. This work is also to include the removal and re-installation of existing stone ballast 40% of existing insulation materials. • Installation of new protected roofing assembly at the main flat roof areas consisting of a two ply modified bituminous roofing membrane, 100 mm thick extruded polystyrene insulation board (reuse 40% of existing insulation materials), permeable fabric, re-used stone ballast, re-use existing concrete pavers replaced damaged pavers, new roof anchors flashing, new metal flashing and related roofing accessories.

A bid bond of 10% made payable to SNC-Lavalin Operations & Maintenance Inc. is required, plus a 50% Performance Bond and a 50% Labour and Material Bond will be required at contract award.

A mandatory site visit will be held on August 4, 2010 (see download documents for details). Failure to attend and register on the site attendance sheet will result in disqualification.

Contractors must be pre-qualified prior to contract award. A full prequalification package and instructions are included with the tender documents. (Please disregard if you are already pre-qualified and have signed a term contract with SNC-Lavalin Operations & Maintenance Inc.)

Sealed bids will be received at the tender box location & address until 2:00:00 pm (local time) on August 12, 2010. Late or misdirected bids will not be accepted. The lowest or any bid will not necessarily be accepted.

TENDER DOCUMENTS, PLANS AND ALL AMENDMENTS WILL BE AVAILABLE ONLY THROUGH MERX DISTRIBUTION. ANY BID FROM A BIDDER WHOSE NAME DOES NOT APPEAR ON THE OFFICIAL MERX DOCUMENT REQUEST LIST (I.E. WHO HAS NOT DOWNLOADED THE DOCUMENTS THEMSELVES) WILL BE DECLARED INVALID, AND THE BID WILL NOT BE CONSIDERED FOR TENDERING.    


 

Contact(s)

Order buyer contact information.

 Print-friendly Version   

 Associated Components:  Order  Document Request List:  N/A  

Preview Associated Components

 

Item Description Language No. of Pages Format No. of Files File Size Additional Information


 Print-friendly Version   

Note: Web site links will be displayed when available. If you click a web site link, you will be connected to another web site. Your MERX session will timeout after 20 minutes of inactivity. Should this occur, please return to the MERX home page and log in to MERX again.

© MERX - All rights reserved. No part of the information contained in the Private Tenders portion of this Web Site may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of MERX and the applicable buying authority. MERX nor the Contracting Authority will assume responsibility or liability for the accuracy of the information contained in the publication.