The Project consists of work to be performed on or adjacent to the Peace Bridge (“Bridge”) that connects Fort Erie, Ontario, Canada and Buffalo, New York, United States of America. The Work to be performed under the Contract generally includes, but will not be limited to the following:
- The design, construction and use of temporary access to the top surfaces and sides of Piers B, A, and 1 through 7 for completion of the work.
- Cleaning of the exposed concrete surfaces on Piers B, A and 1 through 7.
- Repair of concrete cracks by epoxy injection in areas shown on the plans.
- Removal and replacement of structural concrete in areas shown on the plans.
- Application of tinted penetrating sealer to concrete surfaces of Piers B, A, and 1 through 7.
A mandatory pre-bid meeting for all potential Bidders will be held at the project site. For those contractors attending from Canada, the meeting will be held at
10:00 AM (EST) on June 2, 2021 at 100 Queen Street, Fort Erie, ON; for those contractors attending from the U.S., the meeting will be held at
1:00 PM (EST) on June 2, 2021 at 1 Peace Bridge Plaza, Buffalo NY. All interested attendees should submit their intent to the Authority to receive meeting directions and details.
A single contract will be awarded for the project. Response to this invitation for bids, with all original signed documents, is due before
1:00 PM (EST) on June 17, 2021.
For more information on the scope of work and Response requirements, please download the Invitation for Bids at
www.peacebridge.com/rfp.