The District of Hudson’s Hope is seeking proposals from qualified pool installation and service providers to perform concrete repair, leak detection, and pool liner installation for our outdoor community pool in Hudson’s Hope, BC. This work must be completed and the pool operational no later than June 27th, 2024.
The community pool was constructed in 1998 with a concrete base and prefabricated steel wall panels made by Mythra. The membrane liner has reached the end of its useful life and has been roughly patched over the past few years. Recently, the pool has experienced what is believed to be spalling on the concrete surface underneath the liner, accumulating small pieces of concrete under the liner.
The pool comprises a 25m six-lane competition pool with an integrated zero-depth play area. The PVC membrane will be removed and replaced, including all wall surfaces, pool markings, and a Poly-Extruded ‘soft-walk’ sub-floor beneath the membrane. The pool is a Myrtha diagonal flow system, and repairs are conditional on a certificate from the manufacturer confirming the continuation of the structural guarantee of the pool shell. The membrane work shall carry a 10-year warranty for materials and a 2-year warranty on workmanship. The successful proponent will supply and install all required components for the work they are awarded except as noted in the proposal documents.
The information included in this RFP is not prescriptive or overly detailed. Proponents must familiarize themselves with the required work and submit their bids accordingly.