D3.          SCOPE OF SERVICES
D3.1        The Services required under this Contract shall consist of engineering consultancy 
accordance with the following:
(a)   Design temporary shoring to support the building structures at 242, 244, and 246 Princess 
Street and ensure public safety until permanent repairs are completed.
(b)   Assess, identify, and document all structural and building envelope defects and design 
remedial repairs to ensure compliance with relevant by-laws. Refer to Wolfrom Engineering Ltd’s 
Building Condition Report, issued on February 22, 2022, and revised on March 7, 2022, for detailed 
information regarding the structural and building envelope issues. Address severe concerns such as 
deteriorating exteriors, foundations, and roofs, as well  as cracking and separation in masonry 
that allows moisture and weather elements to penetrate.
(c)    Provide comprehensive documentation, including signed and sealed reports, construction 
drawings, and specifications, for all stabilization work required to address the severe structural 
and building envelope issues. Ensure that the interior and exterior are secure and compliant with 
relevant by-laws.
(d)   The report shall include, but is not limited to, the following:
(i)     Identification of structural defects and proposed remedial repairs.
(ii)     CAD elevation drawings illustrating the locations and extent of deterioration and 
structural distress.
(iii)     A summary report with photographs visually depicting observations and assessments of 
deterioration and needed repairs.
(e)   Provide comprehensive consulting services for design, tendering, and contract administration, 
including all necessary activities to ensure the successful completion of the project.
(f)    Provide fees and schedules for deliverables and support services in the following order of 
priority:
(i)     Site Assessment
(ii)     Construction Shoring Documents
(iii)     Construction Remediation Documents
(iv)     Consulting Support during Shoring Tender and Construction
(v)     Consulting Support during Remediation Tender and Construction.
D3.1.1             The Services required under D3.1  shall be in accordance with the City’s Project 
Management Manual http://winnipeg.ca/infrastructure/asset-management- 
program/templates-manuals.stm#2  and templates http://winnipeg.ca/infrastructure/asset- 
management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being 
engaged by the City for their professional expertise; the Consultant shall bring to the Consulting 
Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates 
which the Consultant is of the opinion is not consistent with good industry practice.
D3.2        The following shall apply to the Services:
(a)   Universal Design Policy 
http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
(b)   Should this project include a public engagement aspect, it will be required to meet: Public 
Engagement Guidelines
https://winnipeg.ca/PublicEngagement/pdfs/PublicEngagementRequirements.pdf
(c)    Winnipeg Accessibility Design Standard
https://www.winnipeg.ca/media/3338