DESCRIPTION OF THE WORK:
The Work includes the design, supply, delivery and install of safety boom, buoys and anchoring systems at Slave Falls Generating Station. Descriptions of ITEMS of the Work listed below are provided as a general overview. The detailed Purchaser’s Requirements are provided in the Technical Requirements.
The Work may include one or more of the following ITEMs:
ITEM 1 DESIGN OF ALL-SEASON UPSTREAM SAFETY BOOM, DOWNSTREAM HAZARD BUOYS, ANCHORS AND ATTACHMENTS
ITEM 2 SUPPLY OF ALL-SEASON UPSTREAM SAFETY BOOM, DOWNSTREAM HAZARD BUOYS, ANCHORS AND ATTACHMENTS – PURCHASER’S OPTION
ITEM 3 INSTALLATION OF ALL-SEASON UPSTREAM SAFETY BOOM, DOWNSTREAM HAZARD BUOYS, ANCHORS AND ATTACHMENTS – PURCHASER’S OPTION
ITEM 4 PROVISION OF REQUIRED SPARE PARTS – PURCHASER’S OPTION
ENQUIRIES CAN BE FORWARDED TO:
LUCY BERNHARDT
Manitoba Hydro
SCM – Procurement Operations Department
Floor #2 - 360 Portage Avenue
Winnipeg MB R3C 0G8
FAX: (204) 360-6130
EMAIL: lbernhardt@hydro.mb.ca
EVALUATION CRITERIA
(a) Price 60 %
(b) Detailed work schedule 10 %
(c)Demonstrated track record and previous experience in successfully delivering
two (2) projects of this nature in the last 5 years and qualified experience of
proposed personnel 10%
(e) Environmental Protection Plan or Products 10%
(f) Safety program and record 10%