The Work of this Tender No.:7201 is generally described below:
Section I Structure (Site 0784-00)
Construction of a grade separation structure: Bridge Site No. 0784-10 & interchange modifications located at Provincial Trunk Highway 1 and Provincial Trunk Highway 1A as well as roadways, roundabouts, embankments, drainage, any required settlement mitigation and slope stabilization works, utilities, demolition and removal of the existing interchange structure, environmental protection and restoration of the site, construction staging and traffic control and all associated works impacted by the project.
Section II Bituminous Reconstruction PTH 001 At PTH 1A West Jct (Portage Diversion – Can Oat Road)
Construction of a section of Provincial Trunk Highway 1 and interchange modifications located at Provincial Trunk Highway 1 and Provincial Trunk Highway 1A as well as roadways, embankments, drainage, environmental protection and restoration of the site, construction staging and traffic control and all associated works impacted by the project.
Section III Structure Rehabilitation PTH 001 At Canadian Pacific Railway (Carberry Subdivision)
Intermediate rehabilitation of Provincial Trunk Highway 1 east overpass, Bridge Site No. 0881-00 over CP Railway including; new joints, partial depth replacement of the entire deck, paving, curb repairs, substructure repairs and girder end repairs.