D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Street Works.
(b) Part 2 – Winnipeg Transit Works.
Part 1 – City Street Works
D2.2 Part 1 – City Street Works shall consist of:
(a) Alley Rehabilitation
(i) Bayne Cresence / London Street Alley – Tu-Pelo Ave to Bayne Cres
(ii) Helmsdale Avenue / Kimberly Avenue Alley – Golspie St to Raleigh St
(iii) London Street / McCreedy Road Alley – Tu-Pelo Ave to Amelia Cres
(b) Pavement Rehabilitation
(i) Sawchuk Bay – Antrim Rd to Antrim Rd
(ii) Zeglinski Crescent – Zeglinski Cres to Wiebes Dr
(c) Thin Bituminous Overlay
(i) Chopin Boulevard – Uxbridge Rd N to Wiebes Dr
Part 2 – Winnipeg Transit Works
D2.3 Part 2 – Winnipeg Transit Works shall consist of:
(a) Multi-Use Path
(i) Concordia Avenue – Gateway Rd to Moncton Ave
(ii) London Street – Concordia Ave to Kimberly Ave
(b) Transit Stop Improvements
(i) Tu-Pelo Avenue
D2.4 The major components of the Work are as follows:
(a) Alley Rehabilitation
(i) Full depth concrete joint and slab repairs;
(ii) Adjustment of existing catch basin and manhole frames and covers;
(iii) Adjustment of pre-cast sidewalk blocks;
(iv) Boulevard restoration and sod.
(b) Multi-Use Path
(i) Boulevard excavation;
(ii) Placement of suitable site subgrade material;
(iii) Subgrade compaction;
(iv) Placement of geotextile fabric;
(v) Placement of geogrid;
(vi) Placement of sub-base and base course material;
(vii) Full depth concrete joint and slab repairs, as required;
(viii) Renewal of existing sidewalk, as required;
(ix) Installation of detectable warning tiles;
(x) Renewal of existing curb, as required;
(xi) Construction of modified barrier curb;
(xii) Construction of curb ramp;
(xiii) Construction of 150mm reinforced concrete Transit stops and shelter pads;
(xiv) Placement of asphalt pavement (Type MS1, 75mm thickness);
(xv) Installation of culvert (250mm, corrugated metal pipe);
(xvi) Boulevard restoration and sod.
(c) Pavement Rehabilitation
(i) Planing/removal of existing asphalt;
(ii) Renewal of existing sidewalk;
(iii) Installation of detectable warning tiles;
(iv) Installation of catch basins/catch pits and connection pipes;
(v) Abandon existing drainage inlets;
(vi) Removal/renewal of existing curb;
(vii) Construction of modified lip curb;
(viii) Construction of modified barrier curb;
(ix) Adjustment of pre-cast sidewalk blocks;
(x) Adjustment of catch basin, catch pit and manhole frames and covers;
(xi) Adjustment of water main valves, curb stops and other appurtenances;
(xii) Placement of pavement repair fabric
(xiii) Placement of asphalt overlay (Type MS1, 80-90mm average thickness);
(xiv) Boulevard restoration and sod.
(d) Thin Bituminous Overlay
(i) Full depth concrete joint repairs as, as required;
(ii) Renewal of existing curb, as required;
(iii) Adjustment of catch basins, catch pits and manhole frames and covers;
(iv) Adjustment of water valves and other appurtenances;
(v) Placement of asphalt overlay (Type MS1, 40-60mm average thickness);
(vi) Boulevard restoration and sod.
(e) Transit Stop Improvements
(i) Boulevard excavation;
(ii) Placement of base course;
(iii) Renewal of existing curb, as required;
(iv) Renewal of existing sidewalk, as required;
(v) Construction of 150mm reinforced sidewalk;
(vi) Installation of detectable warning tiles;
(vii) Adjustment of water valves, curb stops and other appurtenancesl;
(viii) Boulevard restoration and sod.
(f) Water and Waste Works
(i) Relocation of existing fire hydrant.