SUMMARY OF WORK:
The major items of work include the following approximate quantities:
1. General requirements including mobilization, de-mobilization and survey layout etc.
2. Remove and dispose of 246m of existing Sanitary Sewer (200mm-250mm dia.)
3. Remove and dispose of 9.8 v.m of existing 3 Manholes including Frame and Covers
4. Remove and dispose of / abandoned 266m existing, 100mm dia. Watermain by inserting filcrete
5. Remove and dispose of / submit 1 existing Water Valves (100mm dia.)
6. Remove and dispose of 258m of existing Concrete Walkway (subject to site condition and deletion)
7. Remove and dispose of 3,520m2 existing Asphalt (100mm-120mm depth)
8. Remove and dispose of 262m of existing Curb & Gutters
9. Remove and dispose of 2 existing Curb Ramps
10. Supply & install new 246m of PVC DR35 Sanitary Sewer 375mm dia. (3m-5m depth) – shored vertical trench
11. Supply & install 3 new, 9.8 v.m of sulfate resistance 1,200mm diameter Manholes
12. Supply & install 3 new NF-80 (floating) Manhole’s Frame & Cover c/w Final Grade Adjustment
13. Supply and install 11 Sanitary Sewer Service Connections complete (subject to site condition and deletion)
14. Maintain (uninterrupted) sanitary services to all the residents throughout construction and bypass pumping of all sanitary flows including inflow and infiltration and back up pump from start till completion of project
15. Over excavation and disposal of approximately 200m3 of unsuitable material (subject to site condition and deletion)
16. Over excavation and placement of 200m3 of Washed Rock (subject to site condition and deletion)
17. Approximately 100m of Special Foundation (subject to site condition and deletion)
18. Adjustment of existing 1 Storm Sewer Manhole and 2 CB complete to the final grade including all labour and materials
19. Maintain (uninterrupted) stormwater / drainage throughout construction and bypass pumping of all stormwater / drainage flows and back up pump from start till completion of project
20. Supply & install new 54m of C-900, PVC DR18 Watermain 150mm dia. (3m depth) – shored vertical trench
21. Supply & install new 212m of C-900, PVC DR18 Watermain 200mm dia. (3m depth) – shored vertical trench
22. Supply and install 1 new, 200mm Gate Valve c/w Valve Box
23. Supply and install 1 new 200mm Air Release valve c/w Chamber complete
24. Supply and install 1 new Fire Hydrant, Valve and Lead complete
25. Tie-in 2 connections to existing watermains complete
26. Supply and install 11 Water Service Connections c/w Valve and Valve Box complete (subject to site condition deletion)
27. Maintain (uninterrupted) water supply to all the residents throughout construction
28. Supply and install 264m3 Sub-Grade Preparation (150mm depth; subject to site condition and deletion)
29. Reuse and install 528m3 existing road’s Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion)
30. Supply and install 528m3 new Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion)
31. Supply and install 3,520m2 of Hotmix Asphalt Concrete Paving (100 mm depth; two lifts; 50mm and 50mm; subject to site condition and deletion)
32. Supply and install 3,520m2 of Cement Stabilization (25Kg/m2/300mm; subject to site condition and deletion)
33. Maintain (uninterrupted) access to all the residents throughout construction
34. Restore (supply & install complete) 1 existing Private Access to its original or better conditions
35. Supply and install new 258m, 1.5m Concrete Walkway (subject to site condition and deletion)
36. Supply and install new 262m of 150 Curb & 250mm Gutter (subject to site condition and deletion)
37. Restore (supply & install complete) existing 2 Private Access to its original or better conditions
38. Supply and install 3,000m2 of new Topsoil (100 mm depth; subject to site condition and deletion)
39. Supply and install 1,000m2 Seeding (subject to site condition and deletion)
40. Supply and install new 2,000m2 Sod (subject to site condition and deletion)
TENDER INQUIRIES
DR. AMIN AUGUSTIN, Ph.D. Civil Engineering, P.Eng.
DIRECTOR
Suite 317, 1524 – 91 Street SW
Edmonton, Alberta Canada T6X 1M5
c. 1-780-298-5606
amin.augustin@cceab.ca