Tender available date: Wednesday, April 16, 2025. Tender closing date: Thursday, May 15, 2025. Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0021275 Grading, Culvert Replacement, Installation of Storm Sewer, Granular Base Course (GBC), Cold Milling, Portland Cement Concrete Pavement, Asphalt Concrete Pavement (ACP), Street Light Installation and Other Work 43:06 to 08 Intersection Improvement (Roundabout) at Jct. of Hwy 49:12 kilometre 51.400 to 51.604 kilometre 0.000 to 1.140 49:12 Intersection Improvement (Roundabout) at Highway Street (Valleyview) kilometre 47.160 to 47.520 PEACE REGION APPROXIMATE QUANTITIES: 122,310 Tonne Supply of Aggregate - With Option 1 Lump Sum Traffic Accommodation 117,000 Cubic Metre Common Excavation 10,300 Cubic Metre Borrow Excavation - Contractor Supplied 339 Metre Culverts - Supply and Install (800 mm dia. C.S.P.) 8,000 Square Metre Erosion Control Soil Covering - Supply and Install (Type B) 14 Unit Catch Basin - Supply and Install (600 mm dia. x 1.83 m) 15 Unit Catch Basin Manhole - Supply and Install 326 Metre Concrete Storm Sewer - Supply and Install 155 Metre Leads - Supply and Install 70,000 Square Metre Topsoil Placement 81,600 Square Metre Preparing Subgrade Surface (First Layer) 75,700 Tonne Granular Base Course Des. 2 Class 25 5,430 Square Metre Concrete Surface - Remove and Dispose 33,500 Square Metre Asphalt Concrete Surface - Remove and Dispose 19,400 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth 43,100 Tonne Asphalt Concrete Pavement – EPS Mix Type H2 (PG 70-28) 5,700 Square Metre Portland Cement Concrete Pavement 3,680 Square Metre Median Concrete Surfacing (150 mm) 2,507 Metre Curb and Gutter - Type 1 85 Unit Pre-Cast Concrete Street Light Base - Supply and Install 5,310 Metre Trenching and Backfilling 400 Metre Underground Electrical Conduit - Supply and Install - Pushed Conduit 5,910 Metre Secondary Cable - Supply and Install (2c#2 AL Teck) 59 Unit Street Light Standard - Supply and Install (13.1 m davit, Type 2 - 18,800 lm Luminaire) Contractor to supply all materials. Contract Completion Date: October 15, 2026.