TND0022743
Cold Milling, Asphalt Concrete Pavement and Other Work
14:04 to 06 City of Edmonton - W of Hwy 824
kilometre 1.140 to 2.910 (EBL)
743 kilometre 4.000 to 7.853 (EBL)
kilometre 0.180 to 1.690 (WBL)
kilometre 3.100 to 7.277 (WBL)
kilometre 0.000 to 7.102 (EBL,WBL)
kilometre 7.102 to 7.230
Construct Raised Concrete Medians, Cold Milling, Asphalt Concrete Pavement and Other Work
21:26 to 28 N of TWP Rd 514 to TWP Rd 520
kilometre 23.920 to 24.723 (NBL,SBL)
kilometre 0.000 to 0.755 (NBL,SBL)
Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation and Other Work
14:04 to 06 Intersection Improvements at Various Locations
14:06 Interchange Ramps Improvement at Hwy 14 & Hwy 21
14:06 Pavement Instrumentation Monitoring System (PIMS), EB, Km 4.900
Demolish Existing Bridge Structure and Other Work
14:06 B.F 09223 Cattlepass Culvert, Km 7.635
NORTH CENTRAL REGION
APPROXIMATE QUANTITIES:
218,900 Tonnes Supply of Aggregate - No Option
1 Lump Sum Traffic Accommodation
15,600 Metres Cutting of Pavement
139,000 Cubic Metres Common Excavation
47,200 Cubic Metres Borrow Excavation - Contractor Supplied
12,100 Cubic Metres Common and/or Borrow Excavation Loaded to Trucks
8,900 Cubic Metres Subgrade Excavation
370 Metres Smooth Wall Steel Pipe - Supply and Install (750 mm dia.)
710 Metres Smooth Wall Steel Pipe - Supply and Install (900 mm dia.)
350 Cubic Metres Grouting of Abandoned Culverts
270 Metres Culvert Liner - Supply and Install (C.I.P.P.) (450 mm Dia.)
165 Metres Culvert Liner - Supply and Install (C.I.P.P.) (600 mm Dia.)
440 Metres Culvert Liner - Supply and Install (C.I.P.P.) (750 mm Dia.)
260 Metres Culvert Liner - Supply and Install (C.I.P.P.) (900 mm Dia.)
2,700 Metres Concrete Curb (100mm Mountable)
1,650 Square Metres Median Concrete Surfacing
1 Lump Sum Pavement Instrumentation Monitoring System (PIMS) - Supply and Install
7 Days On-Site PIMS Installation Support and Training
100,000 Square Metres Preparing Subgrade Surface (First Layer)
69,600 Tonnes Granular Base Course Des. 2 Class 25
142,500 Square Metres Topsoil Placement
248,000 Square Metres Cold Milling Asphalt Pavement - 40 <mm Depth>
7,200 Square Metres Cold Milling Asphalt Pavement - 80 <mm Depth>
148,400 Tonnes Asphalt Concrete Pavement – EPS Mix Type H1 (PG 58-28
1,082 Metres Strong Post W-Beam Guardrail - Supply and Install
6,480 Metres Trenching and Backfilling
1,610 Metres Secondary Cable - Supply and Install - 2c#2 Teck 90 HL Cable
1,660 Metres Secondary Cable - Supply and Install - 2c#3 Teck 90 HL Cable
95 Units Pre-Cast Concrete Street Light Base - Supply and Install
62 Units Street Light Standard - Supply and Install (15m x 2.44m Single Davit and Luminaire
19 Units Street Light Standard - Supply and Install (15m x 2.44m Double Davit and Luminaires
Contractor to supply all materials.
Contract Completion Date: July 31, 2027.
Information/Pre-bid Meeting
Tue•Aug 26, 2025•2:00 pm (MT)