Abbreviated details - Refer to Prequalification Package 1070-CB and PWC– Fireproofing & Firestopping
Prequalification Package 1070-CB and PWC– Fireproofing & Firestopping
Applicable to Scaled Scopes:
A) Subcontract Tenders up to $8,000,000 (PWC/CB) – Firestopping or
B) Subcontract Tenders up to $12,000,000 (PWC/CB) – Fireproofing or
C) Subcontract Tenders up to $20,000,000 (PWC/CB) – Firestopping & Fireproofing
PCL\ED, a Joint Venture, acting as the Construction Manager (CM), is inviting proponents to submit their Statement of Qualifications to prequalify to bid as a fireproofing and/or firestopping Subcontractor, whose team has both the experience and capacity to successfully deliver all required fire protection scopes of work for the Centre Block Rehabilitation Program.
General Scope of Work
Prequalified Bidders will provide pricing in conjunction with drawings, specifications, and CENTRUS’ design intent document(s), for the fabrication, and installation, including all labour,
material, equipment and supervision required for the complete fireproofing and/or firestopping scopes of work for the Centre Block Rehabilitation Program. Scope includes, but not limited to:
Fireproofing:
• Spray-Applied fireproofing to columns, beams and metal decking.
• Intumescent fire resistive coatings.
Firestopping:
o Penetrations: Firestopping electrical and mechanical openings through rated floors or walls with a rated ULC assembly.
o Joints: Firestopping at head and sill joints with approved fire-rated sealants.
o Preparing and submitting Engineering Judgments (EJs) in accordance with manufacturer and industry best practices for unlisted firestop conditions
The Scopes of Work will be further detailed in the tenders to Bidders who successfully prequalify. The Work may be packaged as the CM determines is best for the project. The Subcontractor must demonstrate as requested in 6.3.2 Major Projects and Ongoing Projects and 6.3.3 Comparable Projects (relative to the applicable scale) that they are capable of completing the above noted work within large buildings which include new build, rehabilitation, and renovation work to buildings of similarly significant value (refer to scope scales), buildings which share many of the same scope, scale and complexity details noted in 1.2 Project Description and Project Considerations as defined in Section 1.3 for buildings which have similar quality of finish. This applies to both company and personnel. For the Firestop scope, as part of CCDC 11–2019 Appendix B (“Comparable Projects”), subcontractors must demonstrate their experience by providing examples of relevant projects involving comparable EJ preparation and coordination activities.