WORK OF PROJECT
.1 Work of the project of which work of this contract is a part, is comprised of but not limited
to, the following:
.1 Selective Site Demolition as required to execute the work of this contract.
.2 Construction as follows:
.1 Construction of a new two (2) storey community building for Nation use. Including
but not limited to an administrative suite, cultural education space, multifunctional
community assembly space with a commercial kitchen, childcare and wellness
spaces.
.2 Building to be sprinklered, of non-combustible construction, and with the following
total building area of 2,400 m2.
.3 The installation of a radon collection system.
.4 Site restoration to include associated landscaping as shown on the Drawings.
.3 Project scope to include a “Custodial Period” between Building Completion and Owner
Take-Over/Substantial Completion:
.1 Building Completion date to be Tuesday, August 24, 2027.
.2 Custodial Period to begin immediately upon Building Completion and will end at
Owner Takeover/Substantial Completion date noted below.
.3 During the Custodial Period, Contractor shall provide the necessary Temporary
Utilities to maintain the building at “operational status” and “ready for take-over”
by the Owner. Contractor to expect local utilities will not be available during this
period.
.4 These Temporary Utilities shall be included in the base bid.