Site work and new construction of a day care center within an educational facility.
START: NOVEMBER 5, 2019
OCCUPANCY: MARCH 13, 2020
SITE WORK COMPLETE: MARCH 20, 2020
TOTAL COMPLETION: MARCH 27, 2020
Sub-Trades within these Divisions are invited to participate in this project:
Division 02 Existing Conditions
DESIGNATED SUBSTANCE/REMOVAL REPORT
DEMOLITION AND SALVAGE
Division 03 Concrete
EXTERIOR CONCRETE FORMWORK
CAST IN PLACE LANDSCAPE
CONCRETE
Division 04 Masonry
Masonry Units
Division 06 Wood, Plastics, and Composites
Rough Carpentry
Architectural Woodwork
Division 07 Thermal and Moisture Protection
APPLIED FIREPROOFING
FIRESTOPPING AND SMOKE SEALS
JOINT SEALANTS
Division 08 Openings
STEEL DOORS AND FRAMES
WOOD DOORS
ALUMINUM WINDOWS
GLASS AND GLAZING
Division 09 Finishes
GYPSUM BOARD
TILING
ACOUSTIC TILE CEILINGS
RESILIENT FLOORING
PAINTING
Division 10 Specialties
VISUAL DISPLAY SURFACES
MISCELLANEOUS SPECIALTIES
Division 20 Mechanical
MECHANICAL CONTRACT REQUIREMENTS
MECHANICAL INSULATION
Division 22 Plumbing
MECHANICAL PLUMBING
Division 23 Heating, Ventilating, and Air Conditioning
TESTING AND BALANCING
MECHANICAL HEATING, VENTILATION & AIR CONDITIONING
Division 26 Electrical
ELECTRICAL GENERALREQUIREMENTS
GROUNDING SECONDARY
BASIC MATERIALS
WIRING DEVICES
DISTRIBUTION EQUIPMENT
LUMINAIRES
Division 27 Communications
SPECIAL SYSTEMS
Division 28 Electronic Safety and Security
FIRE DETECTION, PROTECTION AND ALARM SYSTEM (Multi-zone, Addressable)
Division 31 Earthwork
LANDSCAPE GRADING
Division 32 Exterior Improvements
ASPHALT PAVING
CONCRETE PAVING AND EDGES
SYNTHETIC GRASS SURFACING
FENCES AND GATES
TOPSOIL AND FINE GRADING
SODDING
TREE PERSERVATION
Please contact Antonio Biancofiore @ 416-233-3663 ext. 224 or email: a.biancofiore@spectreconstruction.com
Thank you.