Site work and new construction of a day care center within an educational facility.
START: DECEMBER 16, 2019
OCCUPANCY: AUGUST 7, 2020
SITE WORK COMPLETE: AUGUST 7, 2020
TOTAL COMPLETION: AUGUST 31, 2020
Sub-Trades within these Divisions are invited to participate in this project:
Division 02 Existing Conditions
Selective Demolition
Division 03 Concrete
Concrete Reinforcement
Cast-in-Place Concrete
Concrete Finishing
Division 05 Metals
Structural Steel
Miscellaneous Metals
Division 06 Wood, Plastics, and Composites
Rough Carpentry
Finish Carpentry
Architectural Wood Casework
Division 07 Thermal and Moisture Protection
Thermal Insulation
Self-Adhered Air and Vapour Barrier Membrane
Cold Adhesive Applied Modified Bituminous Membrane
Prefinished Metal Flashing and Trim
Firestopping and Smokeseals
Sealants
Division 08 Openings
Metal Doors and Frames
Aluminum Windows
Door Hardware
Finishing Hardware List
Automatic Door Operators
Barrier Free Washroom Kit - Wiring Diagram
Glazing
Fixed Metal Louvers
Division 09 Finishes
Gypsum Board Assemblies
Tiling
Acoustic Ceilings
Resilient Flooring
Painting
Division 10 Specialties
Washroom Accessories
Miscellaneous Specialties
Division 31 Earthwork
Clearing and Grubbing
Soil Stripping and Stockpiling
Removals, Excavating, Trenching & Backfilling
Rough Grading
Division 32 Exterior Improvements
32 11 23 R0 Aggregate Base Courses
32 16 26 R0 Concrete Curbs and Sidewalks
32 18 23 R0 Artificial Turf
32 31 13 R0 Chain Link Fencing and Gates
32 92 23 R0 Sodding
32 93 10 R0 Trees, Shrubs, and Groundcover Planting
Please contact Antonio Biancofiore @ 416-233-3663 ext. 224 or email: a.biancofiore@spectreconstruction.com
Thank you.