SCHEDULE: START: DECEMBER 2, 2019 (ANTICIPATED)
SUBSTANTIAL: JUNE 26, 2020 (ANTICIPATED)
*WORK TO BE PERFORMED REGULAR HOURS UNLESS NOTED OTHERWISE AND EXCEPT FOR CUTTING, DRILLING, X-RAY & NOISY WORK*
DIVISION 02
02 41 19 Selective Building Demolition
DIVISION 04 - MASONRY
04 20 00 Masonry Units
DIVISION 05 - METALS
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
DIVISION 06 – WOOD, PLASTIC AND COMPOSITES
06 10 00 Rough Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 Bituminous Sheet Waterproofing
07 21 00 Building Insulation
07 26 50 Vapour and Air Retarders
07 46 20 Metal Cladding
07 52 00 Cold Applied Built up Roofing
07 60 00 Flashing and Sheet Metal
07 84 00 Firestopping and Smoke Seals
07 92 00 Joint Sealers
DIVISION 08 - OPENINGS
08 11 00 Steel Doors and Frames
08 33 30 Highspeed Coiling Doors
08 71 10 Door Hardware Installation
08 80 00 Glazing
DIVISION 09 - FINISHES
09 67 00 Fluid-Applied Flooring
09 90 00 Paints
Division 20 – 25 Mechanical
Division 26 – 28 Electrical
Division 31
31 10 00 Alteration Project Procedures
31 10 50 Site Demolition
31 11 00 Site Preparation
31 23 00 Earthwork
31 23 10 Exc – Structures
31 23 40 Aggregate Materials
31 25 10 Environmental Protection
32 10 00 Excavation, Backfilling and Compacting for pavement
32 12 20 Granular Base Course
32 12 30 Asphaltic Concrete Paving
32 12 50 Curbs and Sidewalks
32 12 60 Pavement Markings
32 12 70 Signage
33 10 00 Excavation, Backfilling and Compacting for Utilities
33 20 00 Sewer Structures
33 20 10 Storm Sewer Systems
33 20 30 Subdrainage Systems
33 20 40 Closed Circuit Television Inspections of Pipelines