Work of the Contract comprises the Project, for the Seven Oaks School Division James
Nisbet Community School Space Heating Boiler Replacement. Project Work includes
provision of all required labour & materials for a fully operational heating, cooling and
ventilation system. Work includes but is not limited to the following:
.1 Demolition, and removal of existing boilers and hydronic piping systems,
controls, sheet metal, asbestos material and electrical components as indicated in
the tender documents.
.2 Provide new condensing boilers, pumps, hydronic piping system, sheet metal
work, controls and associated mechanical and electrical systems as shown in the
drawings and noted in the specifications.
.3 Provide the required bonds and liability insurance to ensure such specified
assurances to the Owner.
.4 Coordination with equipment supplier(s) to schedule delivery, unloading and safe
storage of equipment.
.5 Layout of the work for construction of complete system and associated works as
noted in drawings and specifications.
.6 Protect existing foundations, superstructure, interior finishes, plant and
equipment during construction
.7 Clean-up of project and site upon completion.
.8 Repair all defects identified during the first year after completion of Work.