D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of:
(a) Concrete Pavement Preservation
(i) Meridian Drive - Inksbrook Drive to Haggart Avenue
(ii) Logan Avenue – Rail Crossing at Weston Street to Blake Street
(b) Diamond Grinding
(i) Logan Avenue - Rail Crossing at Weston Street to Blake Street
(c) Mill and Fill
(i) Northbound Century Street –Ellice Avenue to 75m South of Saskatchewan Avenue
(ii) Westbound Grant Avenue – Chalfont Road to 50m west of Haney Street
D3.2 The major components of the Work are as follows:
(a) Concrete Paving Preservation and Diamond Grinding
(i) Renewal of existing concrete joints through partial and full depth repairs
(ii) Renewal of existing sidewalks, curbs, splash strips and median slabs as required
(iii) Adjustment of existing catch basins, manholes and appurtenances as required
(iv) Diamond grinding
(v) Joint sealing of all joints within diamond grinding areas regardless of preexisting condition of sealant (incidental to Diamond Grinding)
(vi) Crack routing and sealing as required
(vii) Joint sealing all full depth repairs (incidental to Partial Slab Patch Repairs)
(viii) Boulevard restoration as required
(b) Asphalt Mill and Fill
(i) Asphalt pavement milling (average thickness 50mm)
(ii) Renewal of existing concrete joints through full depth concrete repairs
(iii) Partial depth asphalt patching of existing concrete joints
(iv) Placement of Pavement Repair Fabric
(v) Renewal of existing sidewalk, curbs, splash strips and median slabs as required
(vi) Placement of asphalt overlay (average thickness 60mm)
(vii) Reflective crack maintenance
(viii) Boulevard restoration as required
D3.3 Turn lanes and median opening will be not be included in the work on westbound Grant Avenue.
D3.4 The funds available for this contract are $1,454,250.00.