D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of non-destructive condition assessment inspections of critical water and sewer pipelines and appurtenances for the period from September 1, 2025, until August 31, 2028.
D2.2 The major components of the Work are as follows:
(a) Inspection preparation;
(b) Mobilization/Demobilization;
(c) Electromagnetic inspections of PCCP feeder mains;
(d) Acoustic monitoring of PCCP feeder mains;
(e) Leak detection inspections of feeder mains and force mains;
(f) Condition assessment of Large Diameter water valves;
(g) Provision of summary report of results and findings;
(h) Provision of asset risk report(s); and
(i) Provision of engineering report(s).
D2.3 The Work shall be done on an "as required" basis during the term of the Contract.
D2.3.1 The type and quantity of Work to be performed under this Contract shall be as authorized from time to time by the Contract Administrator and/or Users.
D2.3.2 Subject to C7, the City shall have no obligation under the Contract to purchase any quantity of any item in excess of its actual operational requirements.
D2.4 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work.