Tender available date: Tuesday, May 6, 2025. Tender closing date: Tuesday, June 3, 2025. Pre-Tender Meeting: Thursday, May 22, 2025 commencing at 10:30:00 A.M. MST virtually over MS Teams. Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca. TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work: TND0021653 Asphalt Concrete Pavement (ACP), Cold Milling, Grading, Granular Base Course (GBC) and Other Work 35:12, 9 Km N of Hwy 695 - 5 Km S of Hwy 697 kilometre 14.414 to 33.000 Asphalt Concrete Pavement (ACP), Cold Milling and Other Work 35:14, 8 Km N of Hwy 697 - 15 Km N of Hwy 697 kilometre 0.000 to 7.000 PEACE REGION APPROXIMATE QUANTITIES: 146,490 Tonne Supply of Aggregate - With Option 50,000 Tonne Crush to Stockpile Des. 4 Class 25 27,900 Cubic Metre Common Excavation 15,300 Cubic Metre Borrow Excavation - Contractor Supplied 1.60 Kilometre Sideslope Improvement 650 Metre Drainage Improvements 49 Unit Access Improvement 18 Unit Access Removal 201 Cubic Metre Grouting of Abandoned Culverts 646 Metre Culverts - Supply and Install (600 mm dia. C.S.P.) 68 Metre Smooth Wall Steel Pipe - Supply and Install (600 mm dia.) 603 Metre Smooth Wall Steel Pipe - Supply and Install (750 mm dia.) 64 Metre Smooth Wall Steel Pipe - Supply and Install (900 mm dia.) 72 Metre Culvert Liner - Supply and Install (S.W.S.P.) (750 mm dia.) 4,470 Cubic Metre Subgrade Excavation 3,990 Tonne Granular Fill Des. 6 Class 80 3,870 Tonne Granular Fill Des. 2 Class 25 11,500 Tonne Granular Base Course Des. 2 Class 25 85,700 Square Metre Cold Milling Asphalt Pavement - 40 mm Depth 162,900 Square Metre Cold Milling Asphalt Pavement - 80 mm Depth 72,900 Tonne Asphalt Concrete Pavement – EPS Mix Type M1 (PG 58-28) 1,650 Tonne Asphalt Concrete Pavement – EPS Mix Type M1 (PG 52-34) 72.37 Kilometre Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 10 Unit Pre-Cast Concrete Street Light Base - Supply and Install 8 Unit Street Light Standard - Supply and Install - 15m x 2.5m Single Davit & Luminaire 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 73436) 1 Lump Sum Demolition and Disposal of Bridge Curb Structures (B.F. 73436) Contractor to supply all materials. Contract Completion Date: October 15, 2025.